文章预览
The southern section of Shenzhen Metro Line 13's first phase, stretching from Shenzhen Bay Checkpoint Station to Hi-Tech Central Station, commenced trial runs without passengers on August 20, in preparation for its launch at the end of the year. The new line will operate at a maximum speed of 100 km/h. According to line operator HKMTR Shenzhen, during trial operation, the trains will undergo simulated service runs for at least 20 days, following the official timeta ble to ensure all systems meet the necessary operational standards. The first phase of Line 13 spans from Shenzhen Bay Checkpoint Station to Shangwu Station, covering a total distance of 22.441 kilometers and featuring 16 stations. Its southern section, currently in trial, includes 7 stations, 4 of which are interchange stations, including Houhai (connecting with Lines 2 and 11), Keyuan (connecting with Line 2), Yuehaimen (connecting with Line 9), and Shenzhen University (connecting with Line 1). The southern section of
………………………………